A complete building envelope replacement was completed at Cecil Rhodes School in Winnipeg, Manitoba.
This project included the reconstruction of the north, east, south and west walls of the original school and four classroom additions, inclusive of roof modifications for vapour barrier tie-in. The interior walls of the school were stripped of the original exterior finish and reconstructed using steel stud assemblies, increasing external rigid insulation, finishing with clay brick veneer and pre-finished metal panel assemblies.
New fibre glass frame windows and hollow metal steel doors/frames were installed, including a water proof frost-shield insulation to ensure a complete seal.